Flood 2004

Note: for additional information see the text following the pictures.

 

 

 

Slide01 Parlor walls get stripped of plaster and lath.

Slide02 Parlor get all new drywall walls.

Slide03 Parlor closet gets rebuilt.

Slide04 Closet gets new drywall, paint and trim.

Slide05 Fuse box gets replaced and moved to the basement.

Slide06 Wall between parlor and bathroom gets reframed and drywalled.

Slide07 Parlor ceiling gets double joists and new drywall and paint.

Slide08 Parlor gets new, beautiful wood floor.  It is almost done.

Slide09 Downstairs bathroom gets completely stripped.

Slide10 Bathroom gets new toilet and sink.

Slide11 Downstairs bathroom gets completely stripped.

Slide12 Shower gets replaced.

Slide13 Downstairs bathroom gets completely stripped.

Slide14 Downstairs bathroom is almost done.

Slide15 Stairwell gets stripped.

Slide16 Stairwell gets new drywall andpaint.

Slide17 Upstairs bathroom gets completely stripped of plaster and lath.

Slide18 New drywall, paint, and the shower stall gets installed.

Slide19 Upstairs bathroom gets completely stripped of plaster and lath.

Slide20 New drywall, paint, and the sink and counter get installed.

Slide21 Upstairs hallway gets new drywall and floor.

Slide22  Upstairs hallway is nearly finished.

 

Project completed in two months.

Sponsors